Print

Town Electrification Investment Program – Tranche 2: YTOD Surge Tank and Other Remedial Works
Details
Locations:Papua New Guinea
Start Date:Nov 27, 2018
End Date:Unknown
Contract value: USD 10,715,578
Sectors: Civil Engineering, Electrical Engineering, Water & Sanitation
Description
LOAN NO.: 3544-PNG
Executing Agency: Energy Division of the Department of Petroleum & Energy
Nature of Contract: Turnkey
Contract No.: YTOD-ICBV1-01/17-TEIP2-W01
Title: YTOD Surge Tank and Other Remedial Works
Description: The works will consist of the engineering, procurement, construction, installation and testing of a surge tank and other remedial works in Eastern Highlands Province, Papua New Guinea. The project has an installed capacity of 18.0MW with a design discharge of 48.8m3/s with two vertical shaft Francis turbines.
The major work will consist of:
• Construction of the steel surge tank and the associated works
• Design and modifications of the generator cooling systems
• Replacement of one damaged butterfly valve, and
• Replacement / enforcement of 62 meters of damaged penstock to generate at its full rated capacity of 18.0 megawatts.