Batumi Coastal Protection Project: Supervision of Coastal Protection Works

Last update: Jun 22, 2018 Last update: Jun 22, 2018

Details

Locations:Georgia
Start Date:Oct, 2014
End Date:Jul, 2018
Contract value: EUR 1,142,276
Sectors:Civil Engineering
Civil Engineering
Categories:Consulting services
Date posted:Jun 22, 2018

Associated funding

Associated experts

Description

Project Total Value: 11,000,000 EUR

Detailed description of project:
The main objective of the proposed project is to protect the Batumi coast against erosion.
The coastline southwest of Batumi is affected by erosion over a length of about 5 km. along this section a number of houses and cultivated land has been lost already in the past. Without adequate protection measures coastal erosion will continue at the airport area and might even affect the beaches and the coastline of Batumi. The evaluation of the alternatives to protect the coast against the erosion affecting the southern section of the littoral has shown that a soft intervention, featuring recirculation of the sediment between the northern section of the littoral (where it accumulates due to natural transport pattern) and the southern portion (from where it is removed due to erosion), is the most efficient way to protect and restore the beach when combined with an armored revetment at the southern portion.
Therefore, the main intervention aiming at stabilizing this portion of the Batumi coastline features artificial nourishment in the southern portion of the littoral, just north of the airport, spread over a beach length of approximately 2,000 m, using material taken from the northern part of the coastline (where beach accretion is occurring). The modelling studies have shown that the volume of materials needed to maintain the stability of the southern part of the coastline is 30000m3/y.
The main works foresee ninth is Adaptation design for Batumi coastal protection shall comprise:
1. Beachcapitalnourishmentofabout120,000m3of sand and pebble mixture along as tretch of coast of about 1,680 minorder to supply a volume of material of the same order of magnitude of that erodedinthe last years;
2. Construction of are vetmentinthe southern portion of the littoral, for about1,8km,including n° 10beachaccesses;
3. Reconstruction of the boulevard for about 1,750m;
The Consultant is responsible for Supervision of Coastal Protection Works in the City of Batumi noted above, including excavation and earthworks for the placement of renourishment material, filter layers, and revetment armor rock layer, construction of concrete culverts, drainage systems and new boulevard including all expected earth works for boulevard.

Services provided:
1. Provide high quality supervision services
2. Preconstruction planning with regard to supervision logistics and in particular in the preparation of a quality assurance plan and a project supervision manual for the works contract.
3. Supervision during the mobilization phase and any design phases within the works contract
4. Supervision during the construction phases of the works contract
5. Supervision during the Defects Notification Phases of the works contract
6. Support to the Contracting Authority in the issue of final payment certification and issue of the performance certificates for the works contract
7. Support for publicity of the project
8. Interfacing during a transition period with site supervision staff from the MDF who has commenced such activities.
9. Playing an active role in the support of the Contracting Authority in dealing with and claims that arise under sub-clause 20.1 and where needed to support the contracting authority in dispute resolutions.
10. Regular weekly, monthly, and quarterly reports to Contracting Authority.